I have just noticed that I last posted to the blog in July last year - how time flies when you are very busy.
We have built another 6 pools since the last blog and are currently busy on 3 more - one of them a very large project involving the landscaping of a quarry as well as the construction of a 13 x 6 pool.
Here are some details of a few of them:
Pool near Estampes near Tarbres in Dept 65
Pool size 10 x 5 m with Roman End
The pool hopper was built below the water table and needed constant pumping
Contract value approximately 30,000 Euros HT
Pool at Lougratte, to the north of Villeneuve sur Lot in Dept
Pool size 8 x 4 with Roman End
The pool was built into the side of a steep hill and needed a substantial amount of landscaping, as well as the construction of a retaining wall and access steps
Contract value approximately 27,000 Euros HT
Pool at Sacierges Saint-Martin to the south-west of Argenton sur Creuse in Dept 36
Pool size 13 x 5.5 with Roman End
The installation included an Encloture safety fence, 70 square metres of paving slabs and works inside the existing barn
Contract value approximately 45,000 Euros HT
Pool near Cellefrouin to the north east of Angouleme in Dept 16
Pool size 9 x 4 with Roman End
This pool was built on a very small site and all the excavation arisings had to be taken off- site. The installation included a solar shower, an Encloture safety fence, automatic water top-up, a heat pump for pool water heating and 80 square metres of paving slabs
Contract value approximately 40,000 Euros HT
Pool near Montflanquin to the north of Villeneuve sur Lot in Dept 47
Pool size 13 x 6 with motorised floating safety cover and internal steps
Work commenced in Dec 2006 and is continuing. The project involves the movement of about 1000 tonnes of soil, the diversion of a spring through a 200 mm drain, a 25 metre long 2 metre high retaining wall, a buried plant room with an internal heat pump and two large 2 metre wide concrete staircases and the upgrading of the fosse drainage sytem
Contract value in excess of 100,000 euros
We are planning to build about 25 pools in 2007 and we have now recruited the manpower required to achieve this target.
We have an order book of about half of our 2007 target in place and so you need to get intouch with us quickly if you want to swim in your new pool in 2007!!